Every Test Point Read.Every Rectifier on Time.
Corrosion control is thousands of readings on dozens of intervals: annual surveys, rectifiers six times a year, bonds, coupons and atmospheric inspections every three years. X3 Pipeline Corrosion holds every reading against its criterion and every inspection against its limit.
- Annual CP Survey
- Rectifiers & Bonds
- Atmospheric
- Internal
- Exposed Pipe
- Remediation
- 192.463Cathodic protection criteria
- 192.465(a)Annual pipe-to-soil monitoring
- 192.465(b)Rectifiers six times a year
- 192.465(c)Critical interference bonds
- 192.465(d)Prompt remedial action
- 192.481Atmospheric corrosion, 39 months
- 192.477Internal corrosion monitoring
- 192.459Exposed pipe examination
- 195.573Liquid CP monitoring
- 195.583Liquid atmospheric corrosion
- 192.491Corrosion control records
- NACE SP0169−850 mV and 100 mV criteria
The Reading Was Low. It Sat in a Spreadsheet Until the Next Survey.
A technician records a test point at −780 mV and moves on. The spreadsheet does not flag it, nobody opens a remediation, and the same low reading shows up a year later, next to a rectifier that missed two of its six checks.
The readings were taken. Nobody turned the low one into a repair.

Every Reading Against Its Criterion. Every Interval Against Its Limit.
List your test stations, rectifiers, bonds and exposed spans once. X3 checks each reading the moment it is entered and keeps every inspection on its PHMSA interval.
CP survey
Pipe-to-soil readings checked against −850 mV, polarized potential or a 100 mV shift, with low readings flagged on entry.
Rectifiers
Output volts and amps six times a year, with the 2½-month limit counted for each unit.
Bonds
Critical interference bonds on the same six-a-year cycle, the rest every year.
Atmospheric
Exposed spans, casings and splash zones inspected every three years, 39 months at most.
Internal
Coupons and probes twice a year, and internal surfaces examined whenever pipe is removed.
Remediation
Every deficiency gets an owner and a correction date the same day it is found.
A low reading is not a record. It is the start of a repair.
One Program. Every Reading in Its Place.
An example of a corrosion program once test stations and rectifiers are listed and the first readings are in.
- TS-118 at −742 mV instant-off: below −850 mV, remediation not opened (49 CFR 192.465(d))
- Rectifier R-07: last reading 2 months 12 days ago, 2½-month limit in 3 days (192.465(b))
- Casing at Hwy 59 crossing: atmospheric inspection due in 6 weeks (192.481)
- Coupon set C-3: second reading of the year not taken (192.477)
Example only. Your qualified corrosion personnel decide the criterion and the remedy.
11 Working Screens in X3 Pipeline Corrosion
- 01OverviewTest points below criteria, rectifiers past their reading, and inspections coming due.
- 02Annual CP SurveyLog pipe-to-soil readings by test station and see every one below −850 mV or short of a 100 mV shift.
- 03Rectifiers & BondsRectifier output and critical bond checks six times a year, with the 2½-month limit counted for you.
- 04Atmospheric CorrosionPipe exposed to the air inspected every 3 years (39 months onshore), with findings carried to repair.
- 05Internal CorrosionCoupons and probes read twice a year, and every internal surface examined when pipe is removed.
- 06Exposed Pipe ReportsWhenever buried pipe is uncovered: coating condition, corrosion found, pit depth and the remaining-strength decision.
- 07Deficiencies & RemediationEvery deficiency from a survey, rectifier or exposure, with its owner and the date it must be corrected.
- 08Close-Interval SurveysImport a close-interval survey, see on and off potentials along the mileposts against criteria, and turn low spots into deficiencies.
- 09Cased CrossingsEach cased crossing with its casing and pipe potentials, shorted or isolated, and when it was last checked.
- 10Interference & ACAC voltage and current density, DC interference surveys and the interference survey rules for gas transmission.
- 11Coating SurveysCoating surveys after backfill on new or replaced pipe, the damage found and the repair deadline.
List. Read. Flag. Remediate. Prove.
X3 follows a reading from the test station to the corrected deficiency and keeps the record for the life of the pipe.
- 01
List your stations
Test stations, rectifiers, bonds, coupons and exposed spans, by system and milepost.
- 02
Enter the readings
Type them in the field or import a survey file with the template built into the import button.
- 03
See what fails
Every reading short of its criterion is flagged the moment it is saved.
- 04
Open the remediation
The deficiency gets an owner and a correction date.
- 05
Keep the interval
Next due dates are set from the reading date on the PHMSA interval.
- 06
Prove it
Readings and remediation stay with the station for the inspector.
A survey is finished when the last low reading is fixed.

One Loop. X3 Pipeline Corrosion Owns Part of “See”.
Nine products, five stages, one job each. X3 Pipeline Corrosion helps answer one question for your pipeline: which mile is at risk, and why? Use it on its own, or add the products on either side of it when that job matters.
- 01
Know
What applies to every mile we operate?X3 Pipeline Compliance - 02
See
Which mile is at risk, and why?X3 Pipeline IntegrityX3 Pipeline Corrosion - 03
Control
Is the person and the control room ready for the work?X3 Pipeline QualificationX3 Pipeline Control Room - 04
Act
What has to happen in the field today?X3 Pipeline Damage PreventionX3 Pipeline FieldX3 Pipeline Emergency - 05
Prove
Could we hand an inspector the evidence in an hour?X3 Pipeline Audit
X3 Flags the Reading. Your Technicians Decide the Remedy.
Corrosion control needs qualified judgement. Four things stay with your team.
Choose the criterion
Your procedure sets which criterion each station is measured against.
Take accurate readings
Instant-off, IR drop and reference cell care stay with your technicians.
Decide the remedy
Anode beds, rectifier adjustment or coating repair is your call.
Keep it qualified
CP work is a covered task: the person reading must hold the qualification.
Every Low Reading Has a Repair Behind It.
A corrosion program on X3 is a set of readings that meet criteria, a list of deficiencies being fixed and every interval inside its limit.
Read it.
Every station and rectifier on its interval.
Flag it.
Low readings caught the moment they are saved.
Fix it.
Every deficiency owned and closed with proof.
Priced Per Mile. Start With Your Own Systems.
Create your account, describe your systems once, choose X3 Pipeline Corrosion or all nine products, and run it on your own pipeline with your records saved. One sign-in opens every product you pay for.
$499 a month covers your first 100 miles of regulated pipe. Then $3 a month for each mile after that. Twelve months for the price of ten when you pay for a year. Cancel any time.
- CP surveys, rectifiers, bonds and atmospheric and internal corrosion, every reading against criteria and every interval on time.
- Works on its own. No other X3 product required
- Your systems, people and records, saved to your account
- Ask X3 for the regulation behind any question
X3 Pipeline Corrosion and the other eight, one sign-in, one bill. $1,999 a month covers your first 100 miles, then $12 a month for each mile after that.
- Every product from knowing what applies to proving it
- Work flows from one product to the next
- The command center shows leaders what needs attention
- Costs about the same as four products bought one at a time
$1,249 a month for X3 Pipeline Corrosion
$4,999 a month for all nine products
Yearly: $12,490 or $49,990
| Miles | X3 Pipeline Corrosion | All nine products |
|---|---|---|
| 50 | $499 | $1,999 |
| 250 | $949 | $3,799 |
| 500 | $1,699 | $6,799 |
| 1,000 | $3,199 | $12,799 |
| 2,500 | $7,699 | $30,799 |
Why per mile. Pipeline work grows with miles of pipe: patrols, test stations, valves, leak surveys and assessments all scale with the system. So X3 Pipeline is priced per regulated mile. Every product has a monthly minimum that covers your first 100 miles, because every operator carries the same fixed work whatever its size: written procedures, an OQ program, an emergency plan and annual reports. Each mile after that adds a small amount. All nine products cost about four times one, so running the whole loop is the better deal, and paying for a year gets you twelve months for the price of ten.
Prices in US dollars. Subscriptions renew each month or year until cancelled.
Questions Operators Ask About X3 Pipeline Corrosion.
Have one that is not here? Ask X3, or write to us and a person will answer.
Which CP criteria does X3 check?
Can technicians enter readings in the field?
Does it cover hazardous liquid lines?
Do I have to buy all nine products?
How do I start?
How does pricing work?
Can my whole team use it?
Can I keep documents and photos with the records?
Does it work in the field without a signal?
Do the products work together?
Turn Every Low Reading Into a Repair.
Create your account, list your test stations and rectifiers, and enter your first readings.